3 Steps to a Successful Timber Frame Build 

Part of the Timber Frame Series

Get Your Project off to the Right Start

If quality, sustainability, energy efficiency, and shorter construction times are top of your list, then a timber frame build could be for you.  After nearly 30 years of experience in the industry, we have developed a fully insulated closed panel system that allows us to build bespoke homes to meet your sustainable design targets.

Experts

We are experts in offsite manufacture. Our panels are built in a controlled environment where they are handmade by our skilled team of carpenters, and where quality takes top priority. These can then be quickly installed on site in a matter of days.

We are proud that our expert team designed and built our factory, as well as the Passivhaus certified offices next door.

Working Together

But PYC are more than just a factory. We understand that building your own home is an investment and that you may have worries.

We work with you and your architect to ensure you feel supported at each stage of your project. We believe strong communication is paramount to the success of your build.

The steps below outline our process for a successful self-build in more detail.

Design

manufacture

installation

Step 1: Design

The earlier into your project you chat to us, the better. Our team are experts, and their priority is to support you through this process. Once you know where you’d like to build, here are some things to consider during the design stage:

Z

Design Priorities

If you already have a design that meets your targets and budget, that’s great. What are your ‘must haves’ or things you won’t compromise on?

Health & Comfort? Sustainability? Quality? Energy efficiency? Time? Something else?

Z

Working Together

Very often, if we can work alongside your architect, we may be able to identify opportunities or highlight issues prior to finalising your design. Don’t worry about being honest with us about your budget, we may be able to suggest design changes.

Z

Energy Performance Software

If energy efficiency is your top priority you may have considered the Passivhaus standard. We would always recommend you put your project through the design tool, Passive House Planning Package (PHPP), even if you’re not looking to certify the house, it will help you to design the most efficient house possible. See Resources below.

Z

Contracts & Payment

If you decide you’d like us to build your timber frame, we have a straightforward process for the contracts and invoice schedules. We will let you know how this works when we discuss your project.

Z

Location

Logistics are a very important part of the process, so we will need to ask questions such as whether there is access for a crane on site to move the panels into place. This is essential for our method of construction and we can help you work this out.

Z

MVHR

We will work alongside your MVHR supplier in regards to the design, so that our system and theirs is fully coordinated, meaning no nasty surprises on site where you can’t get a duct through a beam.

Step 2: Manufacture

Once our timber frame design is completed, our expert carpenters begin the manufacture process in the factory.

Z

1. Get Organised

Ask about the timeline and what you can do whilst the manufacture is in progress. Depending on the design, the manufacture could be up to five weeks.

Once your site is prepared and ready for us to start, the weather-tight frame could be installed within a week.

Z

2. Communicate

If your project is to be Passivhaus certified we can get photos of the panels being made, for evidence for your certification.

Z

4. Protect Your Investment

All our timber frames are fully engineered and underwritten by our structural engineer. Should you wish to extend to a warranty for the whole building we can make recommendations.

Z

3. Decide how involved do you want to be.

Appointing a main contractor to take the lead is something to consider. They will help you with things like Health and Safety for the duration of your project, right through to ensuring first-fix plumbing, electrics, heating (if required), doors, windows, and roof are taken care of, after the timber frame is erected.

Step 3: Installation

Once we begin manufacture on your project we will arrange a date for the installation of the frame. We may not be able to install on site directly after manufacture for several reasons, but we will work this out with you.
Z

Groundworks

Make sure your groundworker is experienced in creating a level finished slab, the higher quality of the foundations mean a fast installation and having a level perimeter is important for airtightness and thermal bridging.

Z

On Site Preparation

Make sure you have things ready for when the panels arrive. Whatever package you choose, the site preparation including skips and welfare unit must be complete to the required standard so we can erect the timber frame without delay.

Z

Building Control

Remember that Building Control will want to check at key stages: groundworks and foundation at the start and excavation, damp proofing, drains.

You May Also Find These Interesting

Passivhaus Standard

The Passivhaus standard means more than energy efficiency. Why choose it over other standards?

Read the comprehensive guides from the Passivhaus Trust and talk to us

See How We Built Our Offices

We believe so strongly in what we do, we designed and built our own factory and Passivhaus certified offices.

The case study was featured in Passive House+

NSBRC Blog

If you’re completely new to self-build, we highly recommend the resources provided by the NSBRC. Read our blog and find links to their workshops and events.

Sign Up to Our Newsletter

Click to subscribe to updates and

stay in touch with our news, blogs

and resources on sustainable and Passivhaus building